Physical Plant would like to welcome back all students, faculty and staff for the start of a new academic year. We have been working closely with Res Life, many university departments and multiple contractors on several major projects. I would like to thank all of you that worked with us throughout the summer. We anticipate that the Rounds Hall roof will come to a close in early of October. The Highland Hall Project (Phase 1) which is the work on the Citizen’s Bank building, 20 Highland Ave. should be completed by early October as well. We have included in the gallery a section identifying Energy Conservation Tips.

Enjoy the photos by Mark Casale and contact us at any time with questions.

Please check on our Gallery Link and scan the photos for each project:

The Gallery:http://www.plymouth.edu/fsb/GallerySummer08/Gallerymenu08.htm

Photos of Tecumseh include:
Before, during and after exterior shots.
New stairs
http://www.plymouth.edu/fsb/GallerySummer08/WMAC/WMAC.htm

Photos of Rounds Hall include:
Rounds roof is returning to its original slate roof.
http://www.plymouth.edu/fsb/GallerySummer08/Rounds/Rounds.htm

Photos of Hyde Hall:
New door between rooms 351 and 352 plus converted 418D and 418E into office space.
http://www.plymouth.edu/fsb/GallerySummer08/Hyde/Hyde.htm

Photos of Blair Hall:
A new Perimeter Drain was installed
http://www.plymouth.edu/fsb/GallerySummer08/Blair/Blair.htm

Photos of 1 High Street:
Demolition and Construction for the Eco House.
http://www.plymouth.edu/fsb/GallerySummer08/1_High/EcoHouse.htm

Photos of Highland Hall:
Demolition and Construction in preparation for the College of Graduate Studies
http://www.plymouth.edu/fsb/GallerySummer08/Highland/Highland.htm

Photos of Child Development Center:
Baseboard heat replacement
New sod in playground
http://www.plymouth.edu/fsb/GallerySummer08/CDC/CDC.htm

Photos of Physical Plant Crew:
Cresta Lamontagne – Lead BSW
Dick Fletcher – BSW
Joanne Hoyt – BSW
Carolyn Adams – BSW
Richard Tiffany – BSW
Lou Onnembo – BSW
Ellen Braley – BSW
Marlene Santoro – Utility BSW
Greg Bradley – BSW
Apryl Rogers – BSW
Regina Adams – BSW
Colleen Dasilva – BSW
Ken Jensen – BSW
Alana LaMothe – BSW
Antonio Medaglia – BSW
Phelan DuBois – BSW
Pam Busseiere – BSW
April Currier – BSW
http://www.plymouth.edu/fsb/GallerySummer08/Crew/Crew.htm

Photos of Draper & Maynard:
New track lighting installed in the Paint Studio, plus new blinds in room 202
http://www.plymouth.edu/fsb/GallerySummer08/Draper/Draper.htm

Photos of Prospect Hall:
New dumbwaiter has been installed
http://www.plymouth.edu/fsb/GallerySummer08/Prospect/Prospect.htm

Photos of Hartman Union Building:
Complete lighting upgrade for entire building, new retractable hoops will be installed.
http://www.plymouth.edu/fsb/GallerySummer08/HUB/HUB.htm

Photos of 34 Highland Street:
New windows will be installed starting October 6th.
http://www.plymouth.edu/fsb/GallerySummer08/CHURCH/34Highland.htm

Photos of Memorial Hall:
Complete lighting upgrade for entire building.
http://www.plymouth.edu/fsb/GallerySummer08/Memorial/Memorial.htm

Photos of Lamson Library:
New staff elevator to be installed, plus a new cooling tower.
http://www.plymouth.edu/fsb/GallerySummer08/Lamson/Lamson.htm

Photos of Campus Alert System (Siren):
A new campus alert system was installed this summer.
http://www.plymouth.edu/fsb/GallerySummer08/Siren/Siren.htm

Energy Conservation Tips: http://www.plymouth.edu/fsb/GallerySummer08/EnergyConservation.htm

Ellen Shippee
Director of Physical Planthttp://www.plymouth.edu/fsb/GallerySummer08/Highland/Highland.htm

Photos of Child Development Center:
Baseboard heat replacement
New sod in playground
http://www.plymouth.edu/fsb/GallerySummer08/CDC/CDC.htm

Photos of Physical Plant Crew:
Cresta Lamontagne – Lead BSW
Dick Fletcher – BSW
Joanne Hoyt – BSW
Carolyn Adams – BSW
Richard Tiffany – BSW
Lou Onnembo – BSW
Ellen Braley – BSW
Marlene Santoro – Utility BSW
Greg Bradley – BSW
Apryl Rogers – BSW
Regina Adams – BSW
Colleen Dasilva – BSW
Ken Jensen – BSW
Alana LaMothe – BSW
Antonio Medaglia – BSW
Phelan DuBois – BSW
Pam Busseiere – BSW
April Currier – BSW
http://www.plymouth.edu/fsb/GallerySummer08/Crew/Crew.htm

Photos of Draper & Maynard:
New track lighting installed in the Paint Studio, plus new blinds in room 202
http://www.plymouth.edu/fsb/GallerySummer08/Draper/Draper.htm

Photos of Prospect Hall:
New dumbwaiter has been installed
http://www.plymouth.edu/fsb/GallerySummer08/Prospect/Prospect.htm

Photos of Hartman Union Building:
Complete lighting upgrade for entire building, new retractable hoops will be installed.
http://www.plymouth.edu/fsb/GallerySummer08/HUB/HUB.htm

Photos of 34 Highland Street:
New windows will be installed starting October 6th.
http://www.plymouth.edu/fsb/GallerySummer08/CHURCH/34Highland.htm

Photos of Memorial Hall:
Complete lighting upgrade for entire building.
http://www.plymouth.edu/fsb/GallerySummer08/Memorial/Memorial.htm

Photos of Lamson Library:
New staff elevator to be installed, plus a new cooling tower.
http://www.plymouth.edu/fsb/GallerySummer08/Lamson/Lamson.htm

Photos of Campus Alert System (Siren):
A new campus alert system was installed this summer.
http://www.plymouth.edu/fsb/GallerySummer08/Siren/Siren.htm

Energy Conservation Tips: http://www.plymouth.edu/fsb/GallerySummer08/EnergyConservation.htm

For more information about this release, contact Bruce Lyndes, PSU Media Relations Mgr., (603) 535-2775 or Bruce Lyndes

For general information about events at PSU, log on to ThisWeek@PSU at http://thisweek.blogs.plymouth.edu/.

Check out more stories in P-Week